Governorate of Giza Standard Operating Procedures
South Giza District
The technological center to serve the citizens
Subject: The model attached to the soil report
Issue Number: 1 Reference: Law No. 119 of 2008/1 / Date of issue: 1
History / History / Date of Birth / /
The purpose is to create a strong reinforcement
Site data
Lot number: 0000000000000000 Block number: 000000000000 Street: 000000000000000000000000000000000000000000000000000000 Number of blocks:
Neighboring: 000 .000000000000000 District: 000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000
Region / city:. 00000000000000 Province: 0000000000000000000000000000000000000000000000000000000000000000000000
Owner data
Name: 000000000000000000000 National number: 000000000000000000000000000000000000000000000000000000000000000000
Title: 00000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000
Real Estate number: 0000000000000 street:. 000000000000000000000 The role of 0000000000000000000000000000000000000000000000000000000
Apartment: 0000000000000 Residential / village / subdivision / Ezbet / Share: 000000000000000000000000000000000000000000000000000000000000
Shih / village: 0000000000000000 Section / center: 00000000000000000000 Province: 000000000000000000000000000000000000000
Telephone: 0000000000000 Mobile: 00000000000000 Email:. 00000000000000000000000000000000000000000
1) Project Documents 0)
Minutes of receipt of the site (including description of the site and its adjacent facilities and facilities)
• The location of the buildings and the adjacent facilities and facilities
Area of buildings and number of floors and bumps.
• The location of the project
Network budget for the project saver
2) Data of origin 0)
Plot Area: 0000000000000000 Building Area: 0000000000000000 Number of Floors: 000000000000000000
Rise of origin: 0000000000000000000000000000003 The depth of the basements: 00000000000000000000000000000000 trillion
Structural system Concrete wall bearing structure Metal structure Precast units
Other.
South South District Standard Operating Procedures
Topic: Follow the form attached to the soil report
Method Number 1: Issue No. 1 Reference: Law No. 119 of 2008
Number of sessions: 00000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000
According to the Egyptian Code of the foundations and specifications required for the project
00000000000000 Type of mechanical valves The depth of which the terminals are taken is 0000000
Open pit drills
Place the holes on the crooks of the site, with suitable surface fitting and zero fitting of the grooves
For Robber fixed or fixed point on the site
Bonds of the world 00000000000000000 Date / Date / Date Spread /
The entity supervising the implementation of the sensors is 0 trillion trillion trillion
4) Ground water)
Groundwater level: 000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000
5) Assessment of Physics)
The foundation level of the natural surface
Proposed base type Shallow foundations Separate rules Rules for an armed conflict
Deep foundations
The permitted stress at the establishment level
In the case of shallow foundations
Data of Soil Mechanics and Foundations Engineer
Name: 000000000000000000000000000000000000000000000000 National number: 0000000000000000000000000000000
Registration number: 000000000000000000 Consultant number: 000000000000000000000000000000000000000000000000000000
(Attach a crook to the site showing the surrounding properties, direction and places to take the sessions)
Governorate of Giza Standard Operating Procedures
South Giza District
The technological center to serve the citizens
Subject: Follow the form attached to the soil report
Issue Number: 1 Reference: Law No. 119 of 2008/1 / Date of issue: 1
Ground water
The groundwater level is 0000000000000000000000000000000000000000000000
التأسیس والتوصیات
It is attributed to the natural level of the earth's surface of 00000000000000000000000000000000
Proposed base type (shallow bases) (separate rules) (bar codes)
For an armed conflict ()
Deep foundations ()
The permissible strain at the level of establishment
In the case of shallow foundations
Statements: Ammunition of Almaty
The name
٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠
Signing
٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠
Registration number in the union
٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠
Consultant Number
٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠
Crocke attached to the site, explaining with the surrounding properties and the direction of the north and places to take the sessions)
)
South Giza District
The technological center to serve the citizens
Subject: The model attached to the soil report
Issue Number: 1 Reference: Law No. 119 of 2008/1 / Date of issue: 1
History / History / Date of Birth / /
The purpose is to create a strong reinforcement
Site data
Lot number: 0000000000000000 Block number: 000000000000 Street: 000000000000000000000000000000000000000000000000000000 Number of blocks:
Neighboring: 000 .000000000000000 District: 000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000
Region / city:. 00000000000000 Province: 0000000000000000000000000000000000000000000000000000000000000000000000
Owner data
Name: 000000000000000000000 National number: 000000000000000000000000000000000000000000000000000000000000000000
Title: 00000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000
Real Estate number: 0000000000000 street:. 000000000000000000000 The role of 0000000000000000000000000000000000000000000000000000000
Apartment: 0000000000000 Residential / village / subdivision / Ezbet / Share: 000000000000000000000000000000000000000000000000000000000000
Shih / village: 0000000000000000 Section / center: 00000000000000000000 Province: 000000000000000000000000000000000000000
Telephone: 0000000000000 Mobile: 00000000000000 Email:. 00000000000000000000000000000000000000000
1) Project Documents 0)
Minutes of receipt of the site (including description of the site and its adjacent facilities and facilities)
• The location of the buildings and the adjacent facilities and facilities
Area of buildings and number of floors and bumps.
• The location of the project
Network budget for the project saver
2) Data of origin 0)
Plot Area: 0000000000000000 Building Area: 0000000000000000 Number of Floors: 000000000000000000
Rise of origin: 0000000000000000000000000000003 The depth of the basements: 00000000000000000000000000000000 trillion
Structural system Concrete wall bearing structure Metal structure Precast units
Other.
South South District Standard Operating Procedures
Topic: Follow the form attached to the soil report
Method Number 1: Issue No. 1 Reference: Law No. 119 of 2008
Number of sessions: 00000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000
According to the Egyptian Code of the foundations and specifications required for the project
00000000000000 Type of mechanical valves The depth of which the terminals are taken is 0000000
Open pit drills
Place the holes on the crooks of the site, with suitable surface fitting and zero fitting of the grooves
For Robber fixed or fixed point on the site
Bonds of the world 00000000000000000 Date / Date / Date Spread /
The entity supervising the implementation of the sensors is 0 trillion trillion trillion
4) Ground water)
Groundwater level: 000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000
5) Assessment of Physics)
The foundation level of the natural surface
Proposed base type Shallow foundations Separate rules Rules for an armed conflict
Deep foundations
The permitted stress at the establishment level
In the case of shallow foundations
Data of Soil Mechanics and Foundations Engineer
Name: 000000000000000000000000000000000000000000000000 National number: 0000000000000000000000000000000
Registration number: 000000000000000000 Consultant number: 000000000000000000000000000000000000000000000000000000
(Attach a crook to the site showing the surrounding properties, direction and places to take the sessions)
Governorate of Giza Standard Operating Procedures
South Giza District
The technological center to serve the citizens
Subject: Follow the form attached to the soil report
Issue Number: 1 Reference: Law No. 119 of 2008/1 / Date of issue: 1
Ground water
The groundwater level is 0000000000000000000000000000000000000000000000
التأسیس والتوصیات
It is attributed to the natural level of the earth's surface of 00000000000000000000000000000000
Proposed base type (shallow bases) (separate rules) (bar codes)
For an armed conflict ()
Deep foundations ()
The permissible strain at the level of establishment
In the case of shallow foundations
Statements: Ammunition of Almaty
The name
٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠
Signing
٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠
Registration number in the union
٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠
Consultant Number
٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠٠
Crocke attached to the site, explaining with the surrounding properties and the direction of the north and places to take the sessions)
)
No comments:
Post a Comment