project El-Ain El-Sokhna Thermal Power Plant -500/220 KV GIS Substation - Mr.CON.

Mr.CON.

project management&development of factories

Breaking News

Friday, 13 August 2021

project El-Ain El-Sokhna Thermal Power Plant -500/220 KV GIS Substation

 Thermal Power Plant 

500/220 KV GIS Substation


Civil WORKS 


 El-Ain El-Sokhna


REQUEST FOR PROPOSAL

 request your quotation for El-Ain El-Sokhna 500/220 KV GIS Substation, located in Suez Governorate.

In order to allow your company to quote for the above Project, we send you the following documents packages attached here:

 

1.      This RFQ

2.      Construction Package for Civil Works as per Volume 3 of 5   

3.      The BOQ as per tender Specs & Drawings

4.      Civil works tender drawings

5.      Tender Documents including but not limited to General & Specific Conditions, Technical specifications, Addendums, Bulletins & Circulars.

1.    -   GENERAL

The Tenderer is to consider that he would participate in this project to the execution of the works detailed herein as a Subcontractor fully responsible for the technical quality of works, guarantees, time schedule, and other obligations towards our Client.

These inquiry documents define the extent of Works to be executed by the Tenderer if awarded the Subcontract

2.        PREQUALIFICATION REQUIREMENTS FOR TENDERER

2.1                   Technical Capability

          The tender shall submit the company’s brochure/literature showing the organization, fields of activities, and other information which demonstrate his capability and experience as a contractor in the corresponding field. In particular, The tenderer shall, when applicable, attach a copy of his Quality Assurance certificates valid at the date of the proposal.

          The tenderer shall define the organization he would implement in order to perform the Works within the time-limits herein defined in the most efficient manner, with an indication of manpower chart, typical organization chart, supervisory and management personnel.

2.2                   Experience Record

          The Tenderer must have been involved successfully within the last 10 (ten) years in works of similar type, complexity, and magnitude within severe time limits.

          The tender shall submit a complete list of the projects completed in the last ten (10) years in Egypt, and shall give details of the associated organization scheme and local associates.

          The tenderer shall also submit a list of all ongoing and awarded but not yet started projects. Such a list shall include a summary description of the works, the total value of each contract, the level of responsibility of the Tenderer, the percentage still to be completed, and the estimated date of completion.

2.3                   Construction Equipment Capability

          The tenderer shall provide a typical list of construction equipment that would be required for the execution of the Works. At least part of the listed equipment shall be owned by the Tenderer.

2.4                   Financial Capability

          The tenderer shall be a firm, partnership, or company

Ÿ        Duly organized, existing and registered under the laws of his home country

Ÿ        Having not been suspended or black-listed by any government agency, both local and foreign, as individual contractor or partnership or corporation or as a member of a joint venture.

Ÿ        Having no record of unsatisfactory past performance (particularly non-compliance with contract terms, plans, and specifications); no record of defective workmanship and materials supplied, of abandonment of work and similar deficiencies,

Ÿ        Able to supply a down-payment bond and a performance bond issued by a bank acceptable

Ÿ        Having no criminal or civil case pending or finally decided against it involving non-payment of tax, duty or undertaking with the government of any of his subdivisions or branches including government-owned or controlled corporations, both local and foreign.

          For the determination of the Tenderer's financial capability, the Tenderer shall submit company’s statements of assets and liability, income statements, statement of changes in financial position including notes to financial statements for the last three (3) years certified by an independent Certified Public Accountant in the home country of the Tenderer.

          The tenderer shall attach to his tender:

1.      Documents indicating the persons who have signed for the Tenderer.

2.      Completed signed & stamped BOQ.

3.      A soft copy of the priced BOQ on Excel file. Any exceptions or reservations concerning the BOQ items shall be noted separately in Form A. No modifications or omissions whatsoever shall be introduced to the BOQ.

4.      A statement of compliance  Values instructions.

3.    TECHNICAL INFORMATION 

The tenderer shall include in his tender all technical supporting documents and details, and in particular:

a)      Standard company literature for the material and/or services detailed under this inquiry.

b)      Any deviations from the provisions of the technical and commercial requirements detailed hereto.

c)      Detailed of fixed-site installation and main plant/equipment to be mobilized with associated datasheets.

d)      List of main equipment (with their year of manufacture) owned by the Tenderer.

e)      List of exclusions and assumptions.

f)       Time required for mobilization and detail of equipment and personnel to be mobilized, in order to comply with the above-referenced technical specifications.

g)      Detailed time-schedule of planned operations in line with the Master Schedule provided in aforesaid Construction Package document.

4.    PRICES

                   All prices will be quoted as follows according to the format defined under the Construction Package, and shall be inclusive of all applicable taxes, duties and statutory levies which shall be defined in detail.

Prices will be detailed as:

4.1                   Price for Indirect Costs

They include any element of price not included in the Direct Costs hereafter, such as:

-        Mobilisation and demobilization of personnel and equipment,

-        Temporary site facilities,

-        Accommodation and/or camp facilities for site management and staff

-        Office expenses,

-        Service, lifting, handling, and transport equipment and associated operators, as well as all other equipment available on site for general-purpose during the construction period, including for general services,

-        Site management, technical support, and structure (planning, procurement, quantity surveyors, storage personnel, interpreters, etc. ...),

-        Vehicles for above,

-        Overheads,

-        Allowance for risks and contingencies,

-        Profit.

4.2                   Price for Direct Costs, according to the format defined under the technical documents, including:

-        Direct labor work,

-        Direct supervision,

-        Materials incorporated into the Works, except when provided free of charge to the Subcontractor,

-        Consumable materials (including electrodes and welding rods)

-        Specific equipment not included in Indirect Costs here above, and associated operators,

-        Hand tools

-        Subcontractors' prices

 

                   The "Total Direct Costs" will be calculated according to the Quantities and Unit Prices indicated on the bill of quantities.

                   The Unit Prices shall be fixed and firm for the duration of the Project and not subject to adjustment in case of quantity variations.

5.    Contractual Terms and Conditions

                   The detailed Contractual Terms and Conditions will be issued at a later stage.

                   For the purpose of the present offer, the Tenderer shall consider the following:

 5.1                   Validity of the Proposal

                   The proposal shall remain valid for a period of 180 days minimum from the limit date of submittal.

                   Except for the prices of reinforcement steel and cement it will be indicted according to the announcing local price before the contract signing but the tenderer should submit unit price rates he uses basically in  his offer for both reinforcement steel and cement.     

5.2                   Currency

Subcontract Payment Currency: Egyptian Pound

5.3                   Terms of Payment

                   Down-payment:

                   10% of the Subcontract Price (Down-Payment) shall be paid to the Subcontractor upon signature of the Subcontract

                   Such down-payment shall be executed against the provision of the proper guarantees by the Subcontractor (see below).

 

                   Progress Payments:

                   80% of the Subcontract Price shall be paid to the Subcontractor as follows:

-        Direct Costs: according to the progress on-site on the basis of monthly progress certificates.

-        Indirect Costs: pro-rata the Direct Costs.

 

                   Retention Payment

                   10% of the Subcontract Price (retention money) shall be paid to the Subcontractor at the Take Over of the Plant, against a Warranty Period Bond of 5% of the Subcontract Price.

5.4                  Financial Guarantees

                   Performance Bond:

                   The Tenderer shall include in his proposal the costs associated with a performance bond of 10% of the total Subcontract Price that he would have to provide if awarded the Subcontract.

                   A Parent Company Guarantee may also be requested.

                   Down-payment Bond:

                   The tenderer shall include in his proposal the costs associated with a bank guarantee of 10% of the total Subcontract Price that he would have to provide if awarded the Subcontract, for securing the repayment of the down-payment.

5.5                   Liquidated Damages for delays

                   The total of Liquidated Damages for delays shall be determined as per specification.

                   The rules of application of such Liquidated Damages shall be detailed at a later stage.

 

5.6                  Taxes

                   As mentioned in § 4 above.

5.7                   CAR Insurance

                   A Construction/Erection “All Risks” and “Third Party Liability” insurance shall be subscribed for the Project.

5.8                   Other Insurance

                   The tenderer shall include the cost of any other insurance that may be necessary for the execution of the Works and in compliance with applicable law such as, but not limited to, Workers Compensation, Employer’s Liability, insurance covering any construction tools and equipment leased from third parties and Automobile Liability insurance including all owned, non-owned, and hired

 automotive equipment used in the performance of the Works.

5.9                   Governing Law

                   The Subcontract shall be governed and construed in accordance with the Law of the Egyptian Government.


6.    TENDER SUBMITTAL

To be submitted to our Civil Works coordinator as follows:

 

Questions regarding the tender documents shall be delivered in the mail

7.    TENDER SUBMITTAL DATE:

                   No later than -------------------------------------

                   The tender may be faxed as an advance copy to the above-mentioned persons only, provided it is confirmed by mail or DHL or equivalent.

8.    EVALUATION OF TENDERS

                   The tender will be evaluated not only from an economical point of view, but also from a technical and organizational viewpoints, considering also the capability of the Tenderer to perform the Works within a very tight time schedule.

            In that respect, we strongly invite the Tenderer to enhance and detail any element of his Tender which may contribute to increasing---- confidence in such the capability of the Tenderer to comply with the three simultaneous constraints of Budget / Time / Quality

8.1                   Acceptance/Rejection of Tender

           ------   reserves his right to reject or accept any tender and to reject all tenders, without incurring any liability to the affected tenderer(s) or any obligation to inform the Tenderer(s) 

of the ground for such action taken by AREVA. The decision of----  to accept or reject any tender will be final.

8.2                   Tendering Expenses

                   All expenses relating to the participation in this inquiry and preparation of The tender shall be borne by the Tenderer.

9.    LAWS AND REGULATIONS:

                   The tenderer shall ensure that his offer is in full compliance with all laws, statutes and regulations are applicable for such works in EGYPT.

10.    OBLIGATIONS

                   The tenderer is requested to acknowledge receipt of the enclosed Request for Proposal and to indicate the name(s), address, reference telephone number and fax details of the person(s) in charge of this tender.

                   All documents shall be submitted in English.

                   The documents constituting this inquiry file shall be treated as confidential by the Tenderer, his employees, and sub-contractors. Their content shall not be copied nor disclosed to third parties except where such disclosure maybe necessary for the tender preparation, in which case the Tenderer shall transfer the obligation of confidentiality to such third parties.

 

If you do not intend to tender, please return these documents in their entirety to us.

Should you have any particular questions concerning the provisions contained herein, please do not hesitate to contact us, as mentioned in chapter 6 here above.

 El Ain El Sokhna B.O.Q