1 - Study of the project: -
- Studying the executive boards and technical specifications.
- Visit the work site.
- Determining the method of implementation and timetable of the project in principle.
- Inventory the needs of the project (the implementation tools such as workers - materials - equipment).
- Prepare the project schedule in a precise and detailed manner consistent with the reality of the production rates .
2 - Project Management: -
1 - to conduct the project in a way to analyze and think carefully how to: -
- Implementation.
- Set goals step by step.
- Identification of needs.
- Studying the problems facing the project.
- Making critical decisions that solve problems.
- Defining the responsibilities of the organizational structure of the project.
2. (Key elements of project management).
- timetable .
- Costs (contract costs - equipment - workers - raw materials).
- Resources (labor - raw materials - equipment).
3 – تخطيط المشروع : -
- تحديد الأهداف ومعرفة الإحتياجات .
- تحويل
الأهداف إلى خطط تشمل : -
*
الخطة :-
تحديد المستهدف فى مدة محدودة وتحديد كيفية تحقيقه من خلال توظيف الموارد
المتاحة فى
تحقيق الأهداف .
* التخطيط :-
عملية تحديد الأهداف وتحديد طرق تنفيذها فى ضوء المتغيرات المستقبلية وهى
عملية
Comprehensive and time-bound.
4. Reports: -
أولاً : -
التقارير الكتابية وتشمل :
-
Timetable reports.
( إجراء تعديلات مطلوبة – تحديد المتغيرات
المطلوبة – تحديد الأنشطة ) .
-
تقارير
خاصة بموارد وتكاليف المشروع .
-
Resource and cost control reports.
-
Productivity reports.
-
Value learned reports.
-
Tendering reports for use of resources and costs.
-
Resource and cost allocation reports.
-
Reports cost values and rates.
Second: - Preparing the graphical reports:
-
Preparation of reports for graphic drawbar activity Bar charts And make the required adjustments to the graphical reports.
-
Prepare special graphical reports between different activities in the schedule.
-
Prepare
resource and cost graphical reports .
Third: Updating the reporting data
A quick view of reports and control of the output of graphical reports.
5. Information systems: -
The company's information systems department works on managing the project automatically and includes:
-
Set up project timelines.
-
إعداد الموارد المطلوبة لإنهاء المشروع وتوزيعها على
مدار المشروع .
-
إعداد المتدفقات النقدية للمشروع .
-
إعداد التقارير المطلوبة للمشروع .
-
إمكانية متابعة الأعمال أثناء التنفيذ ومعرفة مدى تقدم
أو تأخر الأعمال المشروع .
-
تحديد الأنشطة الحرجة بالمشروع لسرعة إنجازها حتى لا
يتأخر المشروع .
6- تحديد
الخطوط العريضة وتقسيم العمل بالمشروع : -
مشروع إنشاء مصنع السيارات : - ويشمل على
1 –
أعمال تصميم .
2 –
أعمال تصنيع وتوريد .
3 – أعمال إنشاءات .
7 – إستكمال أعمال إنشاء المصنع :-
تقوم بإستكمال البنية الأساسية
للمصنع على النحو التالى :
-
إستكمال الأعمال المدنية بالموقع والإنشاءات الخاصة بها
.
إستكمال الأعمال المعدنية .
-
تنفيذ الأعمال إلكتروميكانيك .
تنفيذ أعمال الطرق بالمصنع .
- تنفيذ أعمال المرافق .
- تنفيذ الأعمال الكهربائية وتشمل لوحات التوزيع – الأنظمة – أعمال مقاومة وإنذار
حريق - الإضاءة – أعمال التكييف - المحولات