Arab Co. for Trading, Manufacturing and Transport Services - consulting

Breaking

Breaking News

Thursday, 28 February 2019

Arab Co. for Trading, Manufacturing and Transport Services

                    Arab Co. for Trading, Manufacturing and Transport Services
                                     Suez Factory
                             
                 The period from Saturday 10 February to 13 February 2018
1-    an introduction
The invitation was directed  by the senior management of the   Arab Company for Trade, Manufacturing and Transport Services to Mr. Eng. Talal Asaad  for an inspection visit to the company's factory in Suez and a preview of   the executed works of  the administrative building for the first and second floors and the extent of matching the works carried out with the design maps given to the implementation contractor, 13 February 2018
2-    Schedule   of visit
- Sat Feb 10: Arrival - Meeting with SMART
- Sunday, February 11: Complete the meeting with Smart
- February 12: Meeting with Contractors (Ahmed Wali Company - Al-Mustafy Company- Al-Fath Company- International Co. for Security Systems - Yasser Al-Sabak)
- Tuesday 13 February: Complete the meeting with Smart
3- About the visit
-          The dawn of Saturday, February 10, the arrival of Mr. Talal Asaad to Cairo airport
-          A special car was sent from the Arab company to Cairo airport to be transferred by Eng. Talal Asaad
-          A drive from Cairo Airport to the Stella Di Mare Hotel in Ain Sukhna was reached by 7:00 am
-          The Arab Company has booked a hotel in Ain Sukhna - Stella Di Mare - to establish a sovereign during the visit
-          The hotel was directed to the hotel at 7:00 am to take a boat from the hotel to the factory of the Arab company in Suez
-          The Arab Company paid all the costs from the establishment and maintenance of the company
-          The factory was reached at 9 am on 10 February
-          Saturday, February 10 - Senior management officials of the Arab company were interviewed at the factory. Traffic was passed   with them   and the administrative building was inspected   quickly. During their visit and their presence at the factory, a meeting was held with Smart Company, which executed the administrative building and business inspection for the first role. The meeting table in Jouara continued on this   day until the farewell from the door of the administrative building at the end of the last day of the visit - Tuesday 13 February -
-          Sunday, February 11 completion of the first and second floors of the administrative building and then the facades of the building and then the fourth floor
-          Monday, February 12, at the request of Eng. Talal, the meeting with 4 contracting companies, which are working in the work site in the factory in Suez. They are Ahmed Wali Company, Al-Mustafy Company, El Fath Co. for Paving and Roads, International Company for Protection Systems and Security, Yasser El-Sabak. In all meetings and attendance of all meetings held in the conference room in the first floor of the administrative building
-          Tuesday 13 February Completion of the inspection with Smart and a meeting with Eng. Ibrahim Samir, a Smart Company official and in the presence of Sulaiman Salem, security officer in the factory
4 - Details of the first day - February 10
-          The senior management officials of the Arab Company were interviewed: Mr. Managing Director of the Arab Company - Dr. Mohamed Salah-Jergosi, a   Greek national, at the headquarters of the administrative building.
-          The first meeting  with SMART started at 12:00 pm to 3:30 pm to start auditing the works for the first round and the second stage  of the administrative building from the architectural point of view only
-          Notes to the first floor of the administrative building according to the vision of Talal:
      1 - There are differences in the measurements signed on maps when compared to nature
-          2-No maps As built
-          3 -   No room preview tables required are numbered by map 
-          4 - defects in paints
-          5 - defects in the ministries
-          6 - the disadvantages of carpentry in the doors above and below, and the plum and salender
-          7. Plumbing defects
-          8 - the disadvantages of paving the bathrooms floors and walls
-          9. Disadvantages of irregularity of power switches
-          10 - defects in the safe
-          11 - not to give the floor floor to groats
-          12 - the presence of hardeners in the grout ground
-          13- The weight of the hose connections with the coupling
-          14 - Notes Tari and spaces around
-          15 - Illumination and intensity in bathrooms and rooms in general - the light is weak and is less than 500 lax
-          16- The windows and the silicon with a general wave - I do not have a sewage system for water
-          18- Algeria Walter
-          19 - Objection to the color of the walls
-          20 - non-match colors finishing carpentry
-          21 - not to use the agreed cutters and replace them with carpentry
-          22 - not to sign wood cutters with nature on the maps
-         5 - Details of the second day 11 February 2018
-          The   Smart company official did not attend the emergency circumstances
-          A letter of   communication was made to SMART Company to bear the cost of the trip due to non-compliance with the implementation of applications sent by email and the number of 11 items previously for more than 3 weeks
 The first and second floor previews were completed with the Smart Engineer on the site and the rest of the notes were recorded
-          1 -   Required drawings detailed in the real situation and the drawings submitted are executive drawings
-          2 - Interior colors of the walls and doors are different from the approved
-          3 - Modification of the House of Light - Covin - in the street and lighting trends in the road to the walls
-          4 - Fix the wooden doors from the top and bottom
-          5- The cafeteria must be equipped with a hood and a combination 
-          6 - silicon windows and the cleanliness of the soil before the water and water streams of the windows of the tiles and porcelain below the doors of the overlapping chromosomes - the door half of the door ends color
-          7. Wooden cutters not matching the drawing
-          8. Brewer doors   and the same door notes and ceramics rooms and the road
-          9 - the ministries for all rooms and cleaning your youth from the dust before the conduct of the solar - 10 - Adjust the heaters of electricity in terms of installation
-          10 - Isolation of the transplantation basin with fiber glass
-          11 - Hammocks baths
-          12. The main road wall has tendencies
-          13 - Aluminum rings and glass cutters
-          14 - Observations of the safe room and its modification and paints, electric fuse and change ceramic tile
-          15. The glass of the circular ladder is not the desired glass
-          15 - The facade of the administrative building in which there is a shortage and a difference according to what is above it and is returned to the original perspective
-          16- Doctor's notes and drawings
-          17 - Modify the House of Light for the suspended ceiling
-          18- Water heaters are raised above the suspended ceiling
-          19. Control of fire boxes
-          20 - Put a sound barrier for doors
-          21.   Note the height of the doors on the ground
-          22. All materials supplied are not approved except for porcelain, which is approved only
-          23 - lack of straightening keys
-          24 - Kowalins and their own keys and salender  
-          6 - Details of the third day 12 February - Meeting with contractors
-          1. Meeting with ISS- Security and safety systems - Annex minutes of the meeting without signing
-          2.      Meeting with Al-Fath Company - Minutes of the meeting without signing
-          3 - Meeting with Ahmed Wali -   attached minutes of the meeting without signing
-          4 - did not attend the company Mustafa on the day specified
-          5. Meeting with Yasser Al-Sabak
-          7- Details of the fourth day of February 13
-          Meeting with Smart in the presence of Ibrahim Samir regarding the administrative building
-          Preview of the workers' building