POWER PLANT- HVAC System - consulting

Breaking

Breaking News

Saturday, 15 May 2021

POWER PLANT- HVAC System

 

POWER PLANT
HVAC System

a]         HVAC system shall be provided for temperature and Humidity Control of the control room.

 The HVAC system shall meet the requirements of all the related Saudi Aramco standards.

b]         The air conditioning shall be provided through Air Conditioning Units. 2x100%, units shall be provided, with automatic change over facility to standby unit(s) in case of failure of working unit(s.


c]         Necessary provision shall be made to introduce filtered fresh air as per applicable standards.


d]         The indoor condition shall be maintained as per requirements of SAES-K-001.


e]         The HVAC system shall switch-off automatically upon detection of fire.


    Painting

a]         General 

            The painting of above-ground pipeline fittings, equipment, etc.

b]         Surface Preparations  

i.          All surfaces to be painted and coated shall be cleaned and prepared in accordance with SAES-H-100, SAES-H-101 and 09 SAMSS-089 as applicable and meet the specific requirements of the selected painting/coating system.

ii.          The quality control record shall be maintained as required by the Saudi Aramco standard.

iii.         The surface preparation shall be inspected by the Owner/Engineer and approved before proceeding to paint.

iv.         The Contractor shall ensure to meet all the safety requirements as outlined in SAES-H-102 during execution of work.


c]         Protective Coating and Paint Systems  

i.          The type of protective coatings and paint the system shall be selected in accordance with Saudi Aramco standards SAES-H-001 and SAES-H-002 with the approval of Owner/Engineer, unless otherwise specified elsewhere.

 The storage and handling of the paints shall also meet the requirements of these standards.

ii.          The equipment and above ground piping shall be painted in accordance with the paint system 

iii.         The valves shall be painted in accordance with APCS-4, meeting the requirements of the above-mentioned standards.

iv.         The paint shall be selected according to the respective paint system in accordance with requirements of SAES-H-101V.

v.         The method of paint application, quality control and the required dry film thickness shall meet the requirements of SAES-H-100. The Contractor shall maintain the necessary equipment/instruments and quality control records accordingly.

vi.         The primer, intermediate coat and top coats shall be of contrasting colors.

vii.        All safety requirements during painting/coating shall be met in accordance with SAES-H-102.


    FBE Coating of Buried Pipes 

a)         The Fusion Bonded Epoxy (FBE) coating of buried pipe shall be carried out in accordance with APCS-104

b)         Adhesion test of coating shall be carried out

c)         100% holiday test of the buried coated pipe

e]         Color Schedule

The color schedule of the above-ground piping, fittings, equipment, etc.

 shall be as approved by the Owner/Engineer for different mediums and/or service of pipe/equipment.



 