The most important apparent defects of the administrative building
1- Interior wall paints
- There are apparent defects for the eye from paints for interior walls in all internal and external walls of the building
- It led to the emergence of areas of color inconsistent with the rest of the walls, especially in the bathrooms, the back stairs, and some rooms
2- Porcelain and ceramic works
There is drumming on floors in many areas
Failure to adjust floor levels
- Verify that porcelain and ceramics are first-class - first sort - and not second sort, because most of the floors are finished
- Reviewing quantities and checking with assays
3- Marble and granite work for the administrative building
Verify the marble and granite supplied according to the specifications
- It was mentioned in the specifications that the thickness is 4 cm, one piece, and the supplier has two layers joined together, the thickness of each one is 2 cm in relation to the floors and stairs, which led to the separation of the two layers from its part.
- He reviews the quantities of the main entrance and the back entrance because it is within the contractor's business
- Windows marble is reviewed as there are many observations
4- Windows and aluminum works
Review the quantities and specifications contained in the assay with the quantities that have been installed
- Reviewing the window supplier sector
Review the supplied accessories
5- Stainless handrail works for the circular stairs and the back stairs
Review the supplied quantities and the quantities contained in the assay
- Review the method of installing the handrail, as it was installed on the marble staircase and not on the side of the concrete stairs, which led to punching work in the stairs.
6- Carpentry, timber, and cutters
- Reviewing the work of partitions and doors and comparing them with the specifications in the test
- Reviewing the work of paints for doors and partitions
Review the accessories supplied for the doors
7- Lighting works for the administrative building
- Review the locations of the keys and the strong surge throughout the building because there is an asymmetry in some places
- Reviewing the house of light on the ground floor and other floors
- Review cable Tri-and that enters into the distribution panels and cover them with the required disbelief
- Review the internal lighting of the entire building
Review of internal low voltage distribution panels
8- Adaptation works for the building
- The number and quality of air conditioners are reviewed according to the presented assay and the capabilities provided in the assay
- The duct for air conditioning is reviewed
- The work of dispensing air conditioners is reviewed
- Review the feeder and cable cables to the air conditioners
9- Fire and alarm work
- The system components are reviewed according to the approved assay
Notes: Supplying building blocks is not standardized
Quantities are reviewed for Lanzar and validated with assay tables
The pipeline network is reviewed from the main and subsidiary pipe diameters, lengths, and cocks
- External piping paint works are reviewed where only primer-coated pipes are found
Failure to supply manual fire extinguishers mentioned in the tender with a Bavarian brand
10- Work on the exterior facades of the building and the elevator corridor
- The external facades are reviewed with the original design, as there is a discrepancy in the implementation and deviations from the original design
- Review the exterior glass facades, where when any airflow occurs, sounds and vibrations are created
- Review the thickness of the glass between the score, the assay, and the resource
- Review the work of supplying and installing the elevator cores and the specifications contained in the testimony
11- The casting of the building
- The acetylcholine works and its quantities must be reviewed, as there is a price per ton in the benchmark at an amount of 27,500 pounds per ton
- Checking the quantities of acetylcholine leads to a saving of 27,500 pounds for each ton that is calculated, which leads to saving large sums
- Steelworks painted with lead primer and not a paint intended for ironworks
12- Feeding works for the building with water
Review the quantities contained in the assay and what was supplied and installed
- Notice that some of the places where the mixers are installed and the batteries that feed them are not identical
- You notice water leakage from some supplied parts
Review the brands of pipes, mixers, and validity certificates
Notes the supply of heaters to the building that is not found in terms of liter capacity
- You notice the presence of leaks from some of the stalagmites of the feeding tubes and the absence of the anchor of the risers
13- Sanitary works for the administrative building
- Reviewing the sewage stalks of the administrative building, where there are no moorings for the riser with leaks
Review the materials supplied to sanitation
- Checking the drainage areas, the bathrooms, or under the sinks, where there are inconsistent pipes in the bathroom
Review insulation in bathroom floors, especially the fourth floor
Review of sewage connections
14- Works of glass partitions of the administrative building
- Reviewing the thickness of the glass for cutters in all floors
Review quantities and specifications in the assay and the supplier that was formulated
15- Final extracts
Reviewing and approving final abstracts
Review the quantities carried out for the assays on the ground
- Final project insurance documents issued by the insurance office
- An insurance policy - if any - for the building
- The record of the primary receipt of the business
Receiving the shop drawings
Receive validity and warranty certificates for the supplied equipment
Receiving lists of spare parts for the supplied devices and equipment