power plant - Systems of visionaries - consulting

Breaking

Breaking News

Tuesday, 13 April 2021

power plant - Systems of visionaries

power plant

Electrical Works

 - Systems of visionaries

The work covered by this section includes securing all tools, labor, devices, and materials, and carrying out all operations related to manufacturing and installing optical systems.


 Main antenna systems. Remote video communication systems, including video recording.

 Video surveillance systems. Products are supplied only and not installed under this section

 Products installed only and not supplied under this section

 Reference Sections

 Basic electrical materials and methods

 Low voltage distribution and services.

 Special systems

 Control devices

 Tests

  

 Coaxial asymmetric conductors

   Audiovisual systems

 Video and television systems and equipment


            Antennas for receiving audio and TV broadcasting in the frequency range from 30 MHz to 1 GHz

Antenna Performance Specifications Preparation Guide. Detailed specification page format

  Cabled distribution systems for television and audio signals

Systems primarily intended for audio and television signals operating between 30MHz and 1GHz

  Description of the system

 Design requirements

 Operating performance requirements

  Vision Systems (TV Systems)


Complete data are provided on operating frequencies, a number of available channels, input and output impedances, and additional functions (eg: Teletext), and the devices necessary to implement them are provided.


  Shop drawings

Shop drawings include hardware location, foundations, and necessary details, including cable details, feeding direction, and distribution box details, including wiring drawings.

The interior, including measurement and protection.


 Samples

 Quality control submissions

 Test reports and certificates

Test reports and certificates are submitted prior to equipment being supplied to the site.


 Project handover submissions

 Project records

 Operation and maintenance data

Complete data on operation and maintenance is provided, especially for TV switches, operation panels,

 channel switching, and reception.

 Other submissions

 quality assurance

Qualification

Systemic requirements

Note: The extent of compliance with the terms designed by the contractor with the requirements of a specific code is determined here, as well as any other requirements for public authorities.


Certificates

Note: It is specified here whether it is necessary to seek the assistance of a third party (an authorized independent agency or laboratory) to issue a certificate of conformity to the product or work performed with certain "specific" requirements.

Quality control

 On-site quality control

It includes on-site quality control performed by the contractor, but is not limited to the following:

Examine the test certificates attached by the supplier as well as the certificates of conformity with the specifications and reference specifications before assembly or installation.


Examination of supply certificates for each consignment to ensure completeness and compliance with the supply request and specifications.


 Off-site quality control

 Origin quality control

 Supply, storage, and handling

Packaging and shipping

 Storage and protection

 Acceptance of material on the site

Note: It applies only to the products supplied by the owner, for which the terms of their acceptance must be specified here.


 Project and site conditions


Current site conditions

Note: The documents that need to be referred to in order to obtain information complementary to the item, such as existing facilities, public utility lines, or land nature reports, etc. are specified here.

 Environmental requirements


 Tables and programs


Note: The requirements for organizing and coordinating a specific work that must be performed in a specific sequence or at the same time as the work of other departments are specified here. The sequence of events should be specified here.


Extraordinary Warranty


Note: The exceptional warranty is shown here only (for example the guarantee for the afforestation depends on the growth periods, which may exceed the normal warranty period).


  Maintenance service

Operation services

Additional materials


Note: Contractor supplied products are described here


The work covered by this section includes securing all tools, labor, devices, and materials, and carrying out all operations related to manufacturing and installing optical systems.


 Main antenna systems.


 Remote video communication systems, including video recording.

 Video surveillance systems.

 Products are supplied only and not installed under this section

 Products installed only and not supplied under this section

 Reference Sections

 Basic electrical materials and methods

 Low voltage distribution and services.

 Special systems

 Control devices

 Tests

  

: Coaxial asymmetric conductors

   Audiovisual systems - Video and television systems and equipment


            Antennas for receiving audio and TV broadcasting in the frequency range from 30 MHz to 1 GHz

Antenna Performance Specifications Preparation Guide. Detailed specification page format

  Cabled distribution systems for television and audio signals

Systems primarily intended for audio and television signals operating between 30MHz and 1GHz

  Description of the system

 Design requirements

 Operating performance requirements

  Vision Systems (TV Systems)

Complete data are provided on operating frequencies, a number of available channels, input and output impedances, and additional functions (eg: Teletext), and the devices necessary to implement them are provided.

  Shop drawings

Shop drawings include hardware location, foundations, and necessary details, including cable details, feeding direction, and distribution box details, including wiring drawings.

The interior, including measurement and protection.

 Samples

 Quality control submissions

 Test reports and certificates

Test reports and certificates are submitted prior to equipment being supplied to the site.

 Project handover submissions

 Project records

 Operation and maintenance data

Complete data on operation and maintenance is provided, especially for TV switches, operation panels, channel switching, and reception.

 Other submissions

 quality assurance

Qualification

Systemic requirements


Note: The extent of compliance with the terms designed by the contractor with the requirements of a specific code is determined here, as well as any other requirements for public authorities.


Certificates

Note: It is specified here whether it is necessary to seek the assistance of a third party (an authorized independent agency or laboratory) to issue a certificate of conformity to the product or work performed with certain "specific" requirements.


Quality control


 On-site quality control


It includes on-site quality control performed by the contractor, but is not limited to the following:

Examine the test certificates attached by the supplier as well as the certificates of conformity with the specifications and reference specifications before assembly or installation.

Examination of supply certificates for each consignment to ensure completeness and compliance with the supply request and specifications.


 Off-site quality control

 Origin quality control

 Supply, storage, and handling

Packaging and shipping

 Storage and protection

 Acceptance of material on the site


Note: It applies only to the products supplied by the owner, for which the terms of their acceptance must be specified here.


 Project and site conditions


Current site conditions

Note: The documents that need to be referred to in order to obtain information complementary to the item, such as existing facilities, public utility lines, or land nature reports, etc. are specified here.

 Environmental requirements


 Tables and programs

Note: The requirements for organizing and coordinating a specific work that must be performed in a specific sequence or at the same time as the work of other departments are specified here. The sequence of events should be specified here.


Extraordinary Warranty

Note: The exceptional warranty is shown here only (for example the guarantee for the afforestation depends on the growth periods, which may exceed the normal warranty period).

 


No comments: