power plant
Electrical Works
- Systems of visionaries
The work covered by this section includes securing all tools, labor, devices, and materials, and carrying out all operations related to manufacturing and installing optical systems.
Main antenna systems. Remote video communication systems, including video recording.
Video surveillance systems. Products are supplied only and not installed under this section
Products installed only and not supplied under this section
Reference Sections
Basic electrical materials and methods
Low voltage distribution and services.
Special systems
Control devices
Tests
Coaxial asymmetric conductors
Audiovisual systems
Video and television systems and equipment
Antennas for receiving audio and TV broadcasting in the frequency range from 30 MHz to 1 GHz
Antenna Performance Specifications Preparation Guide. Detailed specification page format
Cabled distribution systems for television and audio signals
Systems primarily intended for audio and television signals operating between 30MHz and 1GHz
Description of the system
Design requirements
Operating performance requirements
Vision Systems (TV Systems)
Complete data are provided on operating frequencies, a number of available channels, input and output impedances, and additional functions (eg: Teletext), and the devices necessary to implement them are provided.
Shop drawings
Shop drawings include hardware location, foundations, and necessary details, including cable details, feeding direction, and distribution box details, including wiring drawings.
The interior, including measurement and protection.
Samples
Quality control submissions
Test reports and certificates
Test reports and certificates are submitted prior to equipment being supplied to the site.
Project handover submissions
Project records
Operation and maintenance data
Complete data on operation and maintenance is provided, especially for TV switches, operation panels,
channel switching, and reception.
Other submissions
quality assurance
Qualification
Systemic requirements
Note: The extent of compliance with the terms designed by the contractor with the requirements of a specific code is determined here, as well as any other requirements for public authorities.
Certificates
Note: It is specified here whether it is necessary to seek the assistance of a third party (an authorized independent agency or laboratory) to issue a certificate of conformity to the product or work performed with certain "specific" requirements.
Quality control
On-site quality control
It includes on-site quality control performed by the contractor, but is not limited to the following:
Examine the test certificates attached by the supplier as well as the certificates of conformity with the specifications and reference specifications before assembly or installation.
Examination of supply certificates for each consignment to ensure completeness and compliance with the supply request and specifications.
Off-site quality control
Origin quality control
Supply, storage, and handling
Packaging and shipping
Storage and protection
Acceptance of material on the site
Note: It applies only to the products supplied by the owner, for which the terms of their acceptance must be specified here.
Project and site conditions
Current site conditions
Note: The documents that need to be referred to in order to obtain information complementary to the item, such as existing facilities, public utility lines, or land nature reports, etc. are specified here.
Environmental requirements
Tables and programs
Note: The requirements for organizing and coordinating a specific work that must be performed in a specific sequence or at the same time as the work of other departments are specified here. The sequence of events should be specified here.
Extraordinary Warranty
Note: The exceptional warranty is shown here only (for example the guarantee for the afforestation depends on the growth periods, which may exceed the normal warranty period).
Maintenance service
Operation services
Additional materials
Note: Contractor supplied products are described here
The work covered by this section includes securing all tools, labor, devices, and materials, and carrying out all operations related to manufacturing and installing optical systems.
Main antenna systems.
Remote video communication systems, including video recording.
Video surveillance systems.
Products are supplied only and not installed under this section
Products installed only and not supplied under this section
Reference Sections
Basic electrical materials and methods
Low voltage distribution and services.
Special systems
Control devices
Tests
: Coaxial asymmetric conductors
Audiovisual systems - Video and television systems and equipment
Antennas for receiving audio and TV broadcasting in the frequency range from 30 MHz to 1 GHz
Antenna Performance Specifications Preparation Guide. Detailed specification page format
Cabled distribution systems for television and audio signals
Systems primarily intended for audio and television signals operating between 30MHz and 1GHz
Description of the system
Design requirements
Operating performance requirements
Vision Systems (TV Systems)
Complete data are provided on operating frequencies, a number of available channels, input and output impedances, and additional functions (eg: Teletext), and the devices necessary to implement them are provided.
Shop drawings
Shop drawings include hardware location, foundations, and necessary details, including cable details, feeding direction, and distribution box details, including wiring drawings.
The interior, including measurement and protection.
Samples
Quality control submissions
Test reports and certificates
Test reports and certificates are submitted prior to equipment being supplied to the site.
Project handover submissions
Project records
Operation and maintenance data
Complete data on operation and maintenance is provided, especially for TV switches, operation panels, channel switching, and reception.
Other submissions
quality assurance
Qualification
Systemic requirements
Note: The extent of compliance with the terms designed by the contractor with the requirements of a specific code is determined here, as well as any other requirements for public authorities.
Certificates
Note: It is specified here whether it is necessary to seek the assistance of a third party (an authorized independent agency or laboratory) to issue a certificate of conformity to the product or work performed with certain "specific" requirements.
Quality control
On-site quality control
It includes on-site quality control performed by the contractor, but is not limited to the following:
Examine the test certificates attached by the supplier as well as the certificates of conformity with the specifications and reference specifications before assembly or installation.
Examination of supply certificates for each consignment to ensure completeness and compliance with the supply request and specifications.
Off-site quality control
Origin quality control
Supply, storage, and handling
Packaging and shipping
Storage and protection
Acceptance of material on the site
Note: It applies only to the products supplied by the owner, for which the terms of their acceptance must be specified here.
Project and site conditions
Current site conditions
Note: The documents that need to be referred to in order to obtain information complementary to the item, such as existing facilities, public utility lines, or land nature reports, etc. are specified here.
Environmental requirements
Tables and programs
Note: The requirements for organizing and coordinating a specific work that must be performed in a specific sequence or at the same time as the work of other departments are specified here. The sequence of events should be specified here.
Extraordinary Warranty
Note: The exceptional warranty is shown here only (for example the guarantee for the afforestation depends on the growth periods, which may exceed the normal warranty period).
No comments:
Post a Comment