Periodic maintenance of power plants
Work Scope for Repair of Booster
1- Atomizing Air Compressor
GE Ref. # 298A7661P001
: Compressor details
Capacity: 300 CFM
Inlet
pressure: 14.7 PSI
Inlet
temperature: 235 C0
Discharge
pressure 235 PSI
Rated
speed: 4000
RPM CCW
Model #: A5CDL5J34
Manufacturer: Gardner Denver company.
Scope of work to be followed:
¨
Collect and transport the
compressors from PP7.
¨
Inspection of the compressors after
dismantling.
¨
Check the runouts for the rotors
and bearings.
¨
Checking of rotor clearances.
¨
Submission of the inspection report
stating all the repair work to be done and priced a list of replacement spares.
¨
Dispatching to PP.
2-Work Scope for inspection of Main Atomizing Air Compressor
GE Ref. # 302A1537P005
: Compressor details
Capacity: 558 CFM
Inlet pressure: 149 PSI
Inlet
temperature: 235 C0
Discharge
pressure: 225 PSI
Rated speed: 50100 RPM
Manufacturer: 1.
Atlas Capco Comptec Inc. New York The USA.
Scope of
work to be followed:
¨
Collect and transport the
compressors from PP7.
¨
Disassembly and cleaning of
parts.
¨
Submittal of inspection
report clearly stating the list of replacement parts.
¨
Final QA inspection.
¨
Dispatching to PP7.
¨Submit report on work
performed.
3- Work Scope for Repair of Turbine Bearing Liners
1.
Collect and transport the bearing from the PP- site.
2.
Perform incoming inspection.
3.
Solvent clean and visual inspection.
4.
Perform dimensional check.
5.
Skim cut to remove damaged Babbitt.
6.
Weld buildup Babbit
linings.
7.
Final machine bearing bore and oil grooves as per
drawing sizes.
8.
Final dimensional check.
9.
Perform an ultrasonic test of babbitt bonding.
10. Final clean and
QA inspection.
11. Dispatch to
PP-.
12. Submit a report.
4 - Work Scope for Repair of Lube Oil Heat Exchangers
¨
Collect and transport the
heat exchangers from PP7.
¨
Thorough cleaning of heat
exchanger tube bundles (both from inside & outside)
¨
Pressure testing (250PSI) as
per TEMA standard /ASME Div.1 Sec. VIII – Heat Exchanger Unfired.
¨
Repair of leaking tubes and
rectify the leakage without plugging any tube.
¨
Replacement of leaking tubes up to 10% if necessary.
¨
Straightening and cleaning
of tube fins.
¨
Final QA inspection.
¨
Dispatch to PP.
¨
Submit final report on each
heat exchanger.
¨ The delivery period per shipment
of heat exchangers is 6 weeks from the date of site hand over. reserves
the right to give any number of heat exchangers in each shipment depending upon
the availability.
¨
Warranty of 2 years.
5 - Work Scope for manufacturing of cooling fans at pp
¨ Reverse engineering of the fans as per sample.
No comments: